    How to change the Site Energy Cost

    To change the site energy cost (i.e. the cost of buying electricity from your electricity company) from the default £0.35:

    • log in to the Fuuse portal
    • click "Network" on the left hand side menu
    • click "Charging Sites"
    • click "See details" next to the applicable charging site
    • click "Edit charging site" on the top right
    • click "Site Energy" on the menu bar
    • edit the site energy cost

     